BD Hall Constructors Corp. | Barge loading facility
Project status
Permit issued
On April 16, 2021, a project permit was issued to BD Hall Constructors Corporation (the Applicant) to develop the Barge Ramp Installation project at 2320 Rogers Avenue in Coquitlam, British Columbia on federal lands and waters managed by the Vancouver Fraser Port Authority.
The project was approved subject to 48 permit conditions the Applicant must meet to ensure the project does not result in significant adverse environmental effects.
The project is anticipated to take up to 15 weeks to complete. For more information about the project and construction activities, please visit BD Hall’s website (www.bdhall.ca/news/barge-ramp-project-notification).
About the project
The Applicant, BD Hall Constructors Corp., plans to construct a shore-access barge loading facility on the north shore of the Fraser River at 2320 Rogers Avenue in Coquitlam, British Columbia. The purpose of the barge loading facility is to load barges with non-contaminated soil for disposal at sea with appropriate permits from Environment and Climate Change Canada. Barges would be up to 18 metres (58 feet) by 73 metres (240 feet) in size. The facility would also be used to import clean gravel. The source and destination sites of the soil and gravel would be various construction properties throughout Metro Vancouver.
Once constructed, site operations would include upland material storage, trucking of material to and from barges, barge moorage, and barge transportation. It is estimated that one to two barges would be loaded per week for disposal at sea. Vehicle parking, truck staging would not be within federal lands. The barge ramp facility would operate Monday to Saturday between 7:00 a.m. and 8:00 p.m. Approximately 500 trucks per week or 83 trucks per working day, on average, would arrive at the Site during operations.
Project activities and components include
- Installation of a pile-supported barge ramp at the south end of the facility
- Use of land and marine equipment to access and construct at the site
- Installation of twenty-two steel piles with a vibratory hammer on a scow:
- Eight piles would be used to support barge mooring
- Four piles to support the head frame
- Eight piles to support the barge deck and ramp
- Two piles within the foreshore to support the barge deck abutment
- Installation of a prefabricated barge ramp and a headframe to piles, equipped with lights and mooring bollards
- Installation of a prefabricated barge deck to piles
- Installation of prefabricated barge to piles
- Installation of habitat improvements along 25 metres of the beach west of the barge ramp to improve riparian and aquatic habitat, including:
- Regrading
- Strategic placement of rocks
- Vegetation planting
Resources
April 2021 – Approved Project Permit (PER No. 19-092): BD Hall Constructors Corp. | Barge loading facility [PDF]
April 2021 – Project and Environmental Review Report: BD Hall Constructors Corp. | Barge loading facility [PDF]
October 2020 – Fisheries and Oceans Canada Response Letter: BD Hall Constructors Corp. | Barge loading facility [PDF]
August 2020 – Revision log for all updated documents: BD Hall Constructors Corp. | Barge loading facility [PDF]
August 2020 – Cover letter – Updated Document Package: BD Hall Constructors Corp. | Barge loading facility [PDF]
August 2020 – Construction Environmental Management Plan: BD Hall Constructors Corp. | Barge loading facility [PDF]
August 2020 – Construction & Operations Description: BD Hall Constructors Corp. | Barge loading facility [PDF]
August 2020 – Engineering Design Drawings for Barge and Ramp Details: BD Hall Constructors Corp. | Barge loading facility [PDF]
August 2020 – Habitat Design Drawings: BD Hall Constructors Corp. | Barge loading facility [PDF]
August 2020 – Stormwater Pollution Prevention Plan: BD Hall Constructors Corp. | Barge loading facility [PDF]
July 2020 – Archaeological Overview Assessment: BD Hall Constructors Corp. | Barge loading facility (Received and under review)
July 2020 – Pile layout for permit application: BD Hall Constructors Corp. | Barge loading facility [PDF]
July 2020 – Fish & Fish Habitat Impact Assessment Report: BD Hall Constructors Corp. | Barge loading facility [PDF]
July 2020 – Habitat Off-Setting – Habitat Balance and Design: BD Hall Constructors Corp. | Barge loading facility [PDF]
July 2020 – Hydrology assessment letter: BD Hall Constructors Corp. | Barge loading facility [PDF]
April 2020- Archaeological Change Find Procedure: BD Hall Constructors Corp. | Barge loading facility [PDF]
December 2019 – Navigation Protection Program Acknowledgement Letter: BD Hall Constructors Corp. | Barge loading facility [PDF]
August 2019 – Disposal at Sea Alternatives Assessment: BD Hall Constructors Corp. | Barge loading facility [PDF]
August 2019 – Traffic Impact Study: BD Hall Constructors Corp. | Barge loading facility [PDF]
Contact information
For more information about Applicant’s proposed project, please contact Dan Foulkes by email or phone at 604.455.2572.
For questions regarding the Project and Environmental Review of the proposed project, or to get in touch with our team, please contact us by email or phone at 604.665.9047.
Please note, when receiving public feedback, the port authority may collect your personal information, i.e., your name, contact information and personal views and opinions, to inform the PER process. Your personal information may be disclosed to third parties, such as our tenants, in order for them to respond directly to you or help inform our response. You are entitled to submit a complaint to the Privacy Commissioner office here.