Royal Vancouver Yacht Club | Coal Harbour Marina Expansion

December 13, 2018

Project status 

Permit under review   

In December 2018, TyPlan Planning and Management submitted a project permit application on behalf of the Royal Vancouver Yacht Club (RVYC) to expand the Coal Harbour Marina located at 950 Stanley Park Drive, Vancouver, British Columbia in federal waters controlled by the Vancouver Fraser Port Authority. In January 2020, an updated application package was supplied to the port authority.

The proposed project will be reviewed through the Project and Environmental Review (PER) process. This process reviews and evaluates physical works and activities proposed to take place within our jurisdiction, to ensure they will not likely cause significant adverse environmental effects. The process also takes into consideration the interests of local communities.

As part of the PER review, the RVYC is required to solicit public feedback on the proposed project, results of technical studies and proposed mitigation measures. The port authority will conduct formal consultation activities with stakeholder and Indigenous groups as part of the permitting process.

In a related action, the port authority conducted an administrative review of the channel design to assess whether it met related international standards and therefore was safe. In November 2017, we confirmed that the channel meets the 2014 PIANC Harbour Approach Channel Design Guidelines, as well as the 2010 International Federation of Rowing Associations (FISA) guidelines. As this channel is not used for commercial navigation, our assessment of it against these standards is a technical exercise to assess safety only.

Public Consultation

The applicant will be conducting a 15-business day consultation period early in spring 2020. More information will be posted once available.

About the project

RVYC have proposed the Coal Harbour Marina Expansion Project to expand and upgrade their marina and facilities.

The marina is situated within Coal Harbour, immediately to the west of Deadman’s Island and east of the Vancouver Rowing Club. Stanley Park is immediately to the north. The proposed project is primarily to expand the marina and increase the water lot lease area by 13.3% to accommodate an additional 47 slips. The total project area is 76,930 m2 / 828,068 sq. ft., which includes the water lot expansion area of 9,040 m2 / 97,306 sq. ft. and the existing water lot of 67,890 m2 / 730,762 sq. ft.

Project activities and components include:

  • Dismantling of old floats and boat sheds
  • Removal of piles by vibratory extraction or direct pull:
    • 85 old creosote‐treated wooden piles
    • 23 H steel piles
    • 24 cylindrical steel piles (that will be reused on site)
  • Installation of 129 piles driven with either a vibratory or drop hammer from a barge:
    • 48 16‐inch cylindrical steel (new)
    • 24 12.75‐inch cylindrical steel (reused)
    • 35 12.75‐inch cylindrical steel (new)
    • 22 10.75‐inch cylindrical steel (new)
  • Re-positioning of existing floats, fingers and boat sheds
  • Relocation of 52 existing boat sheds via towing
  • Installation of new concrete floats, fingers and corners that are to be constructed off‐site and brought to site by barge (no concrete works will be conducted on‐site)
  • Removal of 37 existing boat sheds and installation of 37 new prefabricated boat sheds that will be constructed off‐site and brought to site by barge
  • Upgrading of float utilities and safety features including upgrades to plumbing, electrical and lighting systems.

Should the proposed project be permitted by the port authority, construction is expected to be phased and take approximately two years to complete.

Resources

December 2018 – Project Permit Application Project Permit Application Form: Royal Vancouver Yacht Club Coal Harbour Marina Expansion [PDF]
December 2018 – Project Permit Application Project Description: Royal Vancouver Yacht Club Coal Harbour Marina Expansion [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Project Description: Appendix A Coal Harbour Master Plan 2012 [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Project Description: Appendix B Coal Harbour Channel Design [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Project Description: Appendix C HMCS Discovery Letter of Support [PDF]
December 2018 – Project Permit Application Project Description: Appendix D City of Vancouver Parks Board Letter [PDF]
December 2018 – Project Permit Application Project Description: Appendix E Marina Design [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Project Description: Appendix F Marine Seismic Refraction, Bathymetry and Sub Bottom Acoustic Profiling Survey Report [PDF]
December 2018 – Project Permit Application Project Description: Appendix G Detailed Construction Staging Memo [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Project Description: Appendix H Rowing Technical Memo [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Project Description: Appendix I Docks and Float Design [PDF]
December 2018 – Project Permit Application Project Description: Appendix J Boat Sheds Design [PDF]
December 2018 – Project Permit Application Project Description: Appendix K View and Shade Memo [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Project Description: Appendix L Coal Harbour Emergency Response Plan [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Project Description: Appendix M Fire and Life Safety Plan [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Project Description: Appendix N Mechanical Design Drawings[PDF]
(Updated March 2020)
December 2018 – Project Permit Application Project Description: Appendix O Electrical Design Package [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Project Description: Appendix P Lighting Plan [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Project Description: Appendix Q Biophysical Survey of Subtidal Habitat [PDF]
December 2018 – Project Permit Application Project Description: Appendix R Construction Environmental Management Plan [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Project Description: Appendix S Environmental Noise Assessment[PDF]
(Updated March 2020)
December 2018 – Project Permit Application Drawing Package: Royal Vancouver Yacht Club Coal Harbour Marina Expansion (1 of 5) [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Drawing Package: Royal Vancouver Yacht Club Coal Harbour Marina Expansion (2 of 5) [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Drawing Package: Royal Vancouver Yacht Club Coal Harbour Marina Expansion (3 of 5) [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Drawing Package: Royal Vancouver Yacht Club Coal Harbour Marina Expansion (4 of 5) [PDF]
(Updated March 2020)
December 2018 – Project Permit Application Drawing Package: Royal Vancouver Yacht Club Coal Harbour Marina Expansion (5 of 5) [PDF]
(Updated March 2020)